Article · Getting started

How a job moves from new to verified

The states a job goes through, and who moves it on at each step.

Updated 31 October 2026

The usual path

  1. New: logged, scanned or routed by a service desk. A coordinator triages it.
  2. Triaged: it has a category and a priority. If the category needs approval, it waits for a Facilities Manager. If not, it is approved at once.
  3. Approved: ready to give to someone.
  4. Assigned: a technician on the team or a contractor has it, and the time can be booked.
  5. In progress: the work has started.
  6. Completed, waiting for verification: the work is done, and a Facilities Manager checks it.
  7. Verified and closed: the work is accepted.

A plan's job starts at approved, or at assigned when the plan names a technician: the plan is its approval.

What the states mean

StateMeaning
newWaiting to be triaged
triagedWaiting for a Facilities Manager's approval
approvedReady to assign
assignedA technician or contractor has it
in progressThe work has started, or it was sent back or reopened
completed, waiting for verificationDone and waiting to be checked (To verify in the Jobs filter)
verified and closedChecked and accepted
Work verified; safety clearance pendingChecked, but a safety hold is still in place
cancelledStopped before the work started

Going back

  • Send back: the work is not finished. The job returns to in progress, with what still needs doing.
  • Reopen: verified work needs more. The job returns to in progress, with why.
  • Cancel the job: only before the work starts, with a reason. A job under way is finished or sent back, not cancelled.

Kinds and priorities

Every job is reactive (a fault or repair), planned (from a maintenance plan) or a safety action. Its priority runs from P1 (now) to P4 (when convenient).